HOT CROSS-REFERENCE SEARCHES All Products
HR911105A Cisco GLC-LH-SMD Pulse J1011F21PNL LPJG0926HENL TE 2170704-1 SFP-10G-SR
POPULAR CATEGORIES
Matched Parts (Real-time ES) Use ↑ ↓ to select, Enter to open
+
  • 21112_SFP+ 1X1 焊接脚 有月牙.5.png
  • 21112_SFP+ 1X1 焊接脚 有月牙.2.png
  • 21112_SFP+ 1X1 焊接脚 有月牙.png
  • 21112_SFP+ 1X1 焊接脚 有月牙.1.png
  • 21112_SFP+ 1X1 焊接脚 有月牙.3.png

LINK-PP LP11BCS2000 SFP+ 1X1 Cage With Grounding Pin EMI Spring Finger

P/N:

LP11BCS2000

Manufacturer:

LINK-PP

Classification:

Compatible Brand:

LP11BCS2000

Compatible P/N:

LINK-PP

  • Compatible Brands: LINK-PP
  • Product Type: Cage
  • Data Rate (Gb/s): 16
  • EMI Shielding: Internal/External EMI Springs
  • PCB Termination: Through Hole - Solder
  • Operating Temperature (°C): -55-85
  • Number of Ports: 1x1
  • Connector Types: SFP+
  • P/N: LP11BCS2000
  • Manufacturer: LINK-PP
  • Compatible Brand: LP11BCS2000
  • Competitor P/N: LINK-PP

Product Specifications

LINK-PP Part Number LP11BCS2000 Part Status Active
Connector Style Cage Connector Type SFP+
Cage COPPER ALLOY,Ni PL ATED PACKAGING TRAY PACKAGING
Port Matrix Configuration 1x1 Port Number of Ports 1
Operating Temperature Range -55 – 85°C Mounting Style Through Hole, Right Angle
Included Lightpipe - Termination Solder
Height (Inches/mm) 9.70/0.382 Length (Inches/mm) 48.70/1.917
Width (Inches/mm) 14.75/0.581 EMI Containment Feature Type EMI Springs

LINK-PP LP11BCS2000 1x1 Port SFP+ Cage with EMI Spring Fingers

Engineered to maximize signal integrity and mechanical stability in demanding data center and telecommunications infrastructure, the LINK-PP LP11BCS2000 is a highly durable 1x1 (single-port) SFP+ cage assembly. Designed as a standalone mechanical receptacle, this shielding cage envelops and protects PCB-mounted electrical connectors, providing critical structural alignment and a protective housing for high-speed Small Form-factor Pluggable Plus (SFP+) optical transceivers and direct-attach copper (DAC) cables.

Constructed from a premium Nickel-Plated Copper Alloy, this heavy-duty cage delivers superior structural rigidity and uncompromising resistance to oxidation and corrosion. Featuring dedicated grounding pins and an extreme military-grade operating temperature range of -55°C to 85°C, the LP11BCS2000 guarantees mission-critical mechanical reliability for both climate-controlled enterprise data centers and unconditioned outdoor edge computing enclosures.

Advanced EMI Containment & Grounding

Managing Electromagnetic Interference (EMI) in high-speed chassis configurations is a critical design mandate. The LP11BCS2000 achieves superior electromagnetic compatibility (EMC) through its advanced shielding and grounding construction.

  • Active EMI Spring Fingers: Heavy-duty metallic EMI spring fingers surround the perimeter of the port opening. These springs ensure continuous, low-impedance electrical contact with the metallic chassis bezel, aggressively sealing the enclosure against external Radio Frequency Interference (RFI) and safely shunting electrostatic discharge (ESD) to ground.
  • Dedicated Grounding Pins: Engineered with specialized through-hole grounding pins that establish a direct, low-inductance path to the motherboard's ground plane, ensuring maximum shielding effectiveness for high-frequency emissions.
  • Nickel-Plated Copper Alloy: The premium metal housing acts as a continuous Faraday shield, aggressively containing internal emissions generated by PHY transceivers and ensuring strict compliance with FCC, CE, and CISPR regulatory standards.

Mechanical Design & Wave Solder PCB Integration

Hardware engineers prioritize long-term mechanical reliability alongside high-yield automated manufacturing. The LP11BCS2000 leverages robust Through-Hole Technology (THT) to optimize the printed circuit board (PCB) assembly workflow.

  • Through-Hole Solder Stability: Designed for standard wave soldering processes, the solid through-hole pins establish a permanent, metallurgical bond with the PCB. This heavily resists the mechanical stress, physical shock, and thermal cycling associated with frequent transceiver insertions in harsh environments.
  • Streamlined Front Panel (No Lightpipes): Designed explicitly without integrated lightpipes, this cage offers a clean, low-interference outer profile. This is highly advantageous for custom faceplate bezels or systems that rely on external, chassis-mounted diagnostic LEDs, reducing internal routing complexity.
  • Tray Packaging for Automation: Supplied in standard tray packaging, ensuring component protection during transit and enabling seamless integration into automated factory floor pick-and-place assembly lines.

Typical Applications

Combining robust EMI containment, secure solder integration, and extended thermal resilience (-55°C to 85°C), the LP11BCS2000 is the optimal mechanical housing for high-throughput network architectures:

  • Data Center & Enterprise Switching: High-density Top-of-Rack (ToR) switches, core edge routers, and network aggregation devices requiring standalone cage configurations.
  • Telecommunications Infrastructure: Broadband access hubs, unconditioned outdoor 5G baseband units (BBUs), and fiber-to-the-x (FTTX) optical line terminals (OLTs).
  • Industrial & Edge Computing: Ruggedized industrial Ethernet gateways and micro-data center nodes deployed in extreme manufacturing or energy sector environments.
  • Network Security: Next-generation firewalls, intrusion detection systems (IDS), and unified threat management (UTM) hardware demanding aggressive EMI containment.

Packaging, Shipping and Global Delivery for Networking Products

Anti-static packaging, shock-resistant protection, fast order dispatch, and reliable worldwide delivery for all LINK-PP networking products.

Anti-Static Protective Packaging

Anti-Static Protective Packaging

Protect networking products from electrostatic discharge and handling-related damage.

Shock-Resistant Transport Protection

Shock-Resistant Transport Protection

Protect products against physical impacts during storage and international transportation.

Fast Order Processing and Dispatch

Fast Order Processing and Dispatch

Accelerate order handling to ensure quick warehouse deployment.

Global Logistics and International Delivery

Global Logistics and International Delivery

Ship products efficiently to customers across worldwide locations.

Technical Support and Deployment Assistance

LINK-PP provides expert technical support, from product selection and compatibility verification to deployment and long-term operation.

Pre-Sales Technical Consultation

Pre-Sales Technical Consultation

Technical consultation to help you verify compatibility and select the appropriate product for your application.

Compatibility Verification Support

Compatibility Verification Support

Verification support to help ensure compatibility with your equipment, applications, and deployment requirements.

Deployment & Installation Assistance

Deployment & Installation Assistance

Comprehensive step-by-step guidance for installation, configuration, and initial setup, ensuring accurate deployment and reliable, stable operation from the start.

Long-Term Technical Assurance

Long-Term Technical Assurance

Ongoing technical support throughout the product lifecycle, delivering long-term stability for enterprise and carrier-grade networks.

Industry Standards, Compliance and Quality Assurance

LINK-PP products are manufactured under recognized quality management systems and designed to support applicable industry standards, regulatory compliance, and long-term deployment requirements, including IEEE 802.3, RoHS, REACH, ISO 9001, and ISO 14001 where applicable. 「View Quality & Compliance Center」

ISO 9001 Quality Management System Certification

ISO 9001 Quality Management

Manufactured under certified quality management processes to ensure consistent product quality and production control.

IEEE 802.3 Ethernet Standard Compliance

IEEE 802.3 Standards Compliance

Designed in accordance with applicable networking and Ethernet standards, including IEEE specifications where relevant.

RoHS Compliance

RoHS Compliance

Manufactured using materials that support restrictions on hazardous substances for global market requirements.

REACH Compliance

REACH Compliance

Material declarations and supply chain processes support applicable REACH regulatory requirements.

Product Safety Assurance

Product Safety Assurance

Selected products support recognized safety and reliability requirements for networking applications.

Reliability Verification Testing

Reliability Verification Testing

Products undergo verification and quality testing to support stable operation in enterprise, telecom, and industrial environments.

Warranty and After-Sales Service

LINK-PP provides warranty coverage and after-sales support to help ensure stable operation and long-term product performance.

15 days

15-day no-reason return and refund

Free maintenance or replacement

Free replacement for dead-on-arrival (DOA) or defective items within the initial period

Free maintenance

Free repair services for manufacturing defects throughout the warranty period

Limitations

Warranty exclusions and conditions apply

Keyword:

Download